Internal infrastructure
The construction of the industrial park began in 1988. Its development was gradual and took into consideration the geomorphology of the terrain. There are currently 78 plots concluded, with areas between 1,000m2 and 28,750m2, representing a grand total of 393,880m2 of infrastructured ground.
The plots are built with layers of mechanically compact soil, allowing a cost effective direct foundations of the buildings.
Each plot has connection boxes to the several different underground networks, namely potable water, sewage, electrical supply system in medium power and telecommunications, as well as a system of rainwater drainage.
The park has also a fire extinguishing network system (made of fire hoses along the roads of the park), a public lighting system, an irrigation network, steam distribution and an internal road system comprising more than 6.6 km of roads, access to plots and sidewalks.
External connections
The IFTZ is served by a water supply public system, a sewage system, a telecommunications digital station and a post office.
The electrical supply system is composed of a 60 kV power cable connected to public substation, situated at the entrance of the park.
A motorway between Funchal and Caniçal assures the road access, with two lanes in each way, resulting in average connection times of approximately 25 minutes.